B04.04. Elements of Construction / Architecture

(According to CI/Sfb)

Table 0 – Physical Environment
9Common FacilitiesMeas. Unit
91Circulation
92Resting and work
93Culinaryvg / u
94Sanitary and hygiene
Table 1 – Elements
1Substructure 
2Primary ElementsMeas. Unit
21External Wallsm2
22Internal Wallsm2
23Floorsm2
23.01 – 23.49Externalm2
23.50 – 23.99Internalm2
24Stairs, Rampas
25Façade Shading Systemsm2 / u
26Balconys’ stalls and Drying Areasu
27Roofsm2
28Shafts
29Parts of Elements (Pre-Fabricated)u
3Secondary ElementsMeas. Unit
31External Doors and Windowsu
31FFire Ratedu
31WWoodu
31MMetallicu
31GGlassu
31TCurtain Wallu
32Internal Doors and Windowsu
32FFire Ratedu
32WWoodu
32MMetalicu
32GGlassu
32TCurtain Wallu
33Skirtingsm
33.01 – 33.49Externalm
33.50 – 33.99Internalm
34Stairs Railingsm
34.01 – 34.49Externalm
34.50 – 34.99Internalm
35Suspended Ceilingsm2
35.01 – 35.49Externalm2
35.50 – 35.99Internalm2
36Ceiling Moldings & Covesm
36.01 – 36.49Externalm
36.50 – 36.99Internalm
37Chimneys and Roofs’ Technical Areasu
38Railingsm
39Coping, Sills and Thresholdsm
39.01 – 39.49Externalm
39.50 – 39.99Internalm
4FinishesMeas. Unit
41External Wallm2
42Internal Wallm2
43Floorm2
43.01 – 43.49Externalm2
43.50 – 43.99Internalm2
44Stairm2
44.01 – 44.49Externalm2
44.50 – 44.99Internalm2
45Ceilingm2
45.01 – 45.49Externalm2
45.50 – 45.99Internalm2
46Equipmentm2
47Roofm2
48Other Finishes to Structurem2
49Parts of Elementsm2
  
5Piped and Ducted 
6Electrical and MechanicalMeas. Unit
63Lightingm / u
67Liftsu
7Fixed EquipmentsMeas. Unit
72Resting and work (Furniture)u
73Culinary (Kitchen)u
74Sanitary and hygiene (Bathroom)u
76Storage (Fixed Equipents / Closet)u
78Othersu
8Loose Furniture and Equipment (Interior Design)Meas. Unit
82Resting and work (Furniture)u
83Culinary (Kitchen)u
84Sanitary and hygiene (Bathroom Accessories)u
86Storage (Lockers)u
88Othersu
 
Table 3 Materiais
 Special PurposesMeas. Unit
mInorganic Fibers (Insulations, …)m2
rPlaster, Mortarsm2
r.01 – r.49Externalm2
r.50 – r.99Internalm2
vPaintsm2
v.01 – v.49Externalm2
v.50 – v.99Internalm2
yComposite (Vynil,..)m2
 
Table 4 – Activities
 Special PurposesMeas. Unit
C1Building Sitevg
C2Demolitionsm2 / vg
C3Othersm2 / vg
DConstruction OperationsMeas. Unit
D1Protectingm2 / vg
D2Clearing, Preparingm2 / vg
D3Transporting, Liftingkg / vg
D4Forming: Cutting, Shaping, fittingm2 / vg
D5Treatment: drilling, boringm2 / vg
D6Placing: laying, applyingm2 / vg
D7Making Good, Reparingm2 / vg
D8Cleaning Upm2 / vg
D9Other Construction Operationsm2 / vg

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *